Tuesday, March 8, 2011

One Step Forward, Two Steps Back



On Monday the plumber came to install our kitchen faucet, which we ordered back in Fall. Although we're loving how it looks, the spray that we ordered to go with it is conspicuously missing—you can see the empty hole to the right of the faucet. We were told by the plumber that the spray does not "work" with the faucet. Hmmm. Not sure about what this means, but we're leaving to the place we bought the faucet and spray from to figure it out.

The same day the plumber came, they also came to fix some of the cracked glass tiles in our guest bathroom. Unfortunately, we didn't know that this would be done so we didn't leave out any replacement tiles. Therefore, we now have empty spaces on our guest bathroom wall, where new tiles will need to be placed. Similarly, although the workmen spackled some areas around our windows and closets that had cracked, they did not paint over the spackle. This means that we are now in a pseudo-work zone. Again. Let's hope this doesn't last long.

No comments:

Post a Comment